CASE
STUDIES
01 - FUZHOU POWER STATION
Location: Peoples
Republic of China
Contract Value: £100,000
Start Date: 6th July 2000
Completion: 11th October 2001
Scope: To supply a full range of Fire
Cables and Accessories to enable the full workings of
a fire safety system to work within a Power Station environment.
The brief was completed in full with our Firecel Product
ensuring the specific labelling requirements were met. |
 |
 |
 |
 |
 |
| Pictured:
Power Station |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
02
- CHASE MANHATTAN BANK - DEALING ROOMS
Location: London
Centre
Contract Value: £50,000
Start Date: October 1999
Completion Date: 23rd December 1999
Scope: To supply fully fire rated cables
for a new system to supply UPS to the dealing rooms.
Our brief was to design a Flexible Armoured Cable that
could both protect but be easily installed in a confined
area.
This was achieved by means of Firecel SR114H + GSWB, the
system saved a lot of insurance cost and down time and
CBL ensured the goods of the correct quality were delivered
on time. |
 |
 |
 |
 |
 |
| Pictured:
Chase Manhattan Bank |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
03
- BIRMINGHAM AIRPORT
Location: Birmingham
U.K.
Contract Value: £50,000
Start Date: 30th October 1999
Completion: On-Going
Scope: To supply fire-rated cables for
the phased development of Birmingham Airport Fire Systems.
Our Brief was to show the advantages of our product over
the other styles available to the Chief Fire Officer to
gain approval.
This was achieved and phase II was completed in Firecel
SR114H cables utilizing the Firecel stripping tools. |
 |
 |
 |
 |
 |
| Pictured:
Birmingham Airport |
|
 |
 |
 |
 |
 |
 |
 |
 |