CASE
STUDIES 01
- LANCASTER TUNNEL Location:
Birmingham. England
Contract Value: £20,000
Start Date: 6th March 2006
Completion: 21st March 2006
Scope: Supply test and commission. |
 |
 |
 |
 |
 |
| Pictured:
Birmingham Tunnel |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
02
- LUNDBY
TUNNEL Location:
Stockholm
Contract Value: £200,000
Start Date: January 2006
Completion: February 2006
Scope: Supply test and commission. |
 |
 |
 |
 |
 |
| Pictured:
Stockholm |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
03
- AUTOM
PARKING TOWER Location:
Taipei Peoples Republic of China
Contract Value:
Start Date: 1999
Completion: 1999
Scope: To protect an underground car
park in a tower block. |
 |
 |
 |
 |
 |
| Pictured:
Fire Detection in the Underground
Parking |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
04
- PPL POWER STATION CABLE TRAYS
Location: Alivori,
Greece
Contract Value:
Date: 1999
Scope: To protect cable trays throughout
a power station. |
 |
 |
 |
 |
 |
| Pictured:
Cable Trays |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
05-
BASF BECT CONVEYOR SYSTEM Location:
Ludwiclshafen, Germany
Contract Value:
Date: 1995
Scope: To protect a belt conveyor. |
 |
 |
 |
 |
 |
| Pictured:
Belt Conveyors in the Power
Station |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
06-
WALDAU - WERNHALDE RAIL AND SUBWAY TUNNELS AND MARSHALLING
TUNNELS Location:
Stuttgart Germany
Contract Value:
Date: 1998
Scope: To protect a repair shed. |
 |
 |
 |
 |
 |
| Pictured:
Stutggart |
|
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
 |
07
- LUZERN COLD STORAGE DEPOT Location:
Luzern, Switzerland
Contract Value:
Start Date: 2004
Completion: 11
Scope: To protect a cold storage area
utalising
differnetial minus temperatures. |
 |
 |
 |
 |
 |
| Pictured:
Lake Luzern |
|
 |
 |
 |
 |
 |
 |
 |
 |